One-off Special Grant for Electricity Reconnection for Vulnerable Households
National measure (Joint Ministerial Decision of the Ministry of Environment and Energy), run by each municipality: households whose electricity supply has been cut off because of debt, income up to €9,000 (+€4,500/member).
One-off coverage of the debt to the electricity supplier: debt up to €6,000 -> 100% covered; €6,001-€9,000 -> 75%; €9,001-€12,000 -> 50%; over €12,000 -> 30%
Who can get it
Official evidence · ΚΥΑ ΥΠΕΝ/ΔΗΕ/70697/861/2020 (ΦΕΚ Β΄ 3088/2020): «Μονοπρόσωπο νοικοκυριό 9.000 ευρώ» · «Νοικοκυριό αποτελούμενο από τρία ενήλικα και ένα ανήλικο μέλος ή δύο ενήλικα και τρία ανήλικα μέλη ή μονογονεϊκή οικογένεια με τέσσερα ανήλικα μέλη 24.750 ευρώ» · «Νοικοκυριό αποτελούμενο από τέσσερα ενήλικα μέλη ή δύο ενήλικα και τέσσερα ανήλικα μέλη ή μονογονεϊκή οικογένεια με πέντε ανήλικα μέλη 27.000 ευρώ» · «Για κάθε επιπλέον ενήλικο μέλος προστίθεται το ποσό των τεσσάρων χιλιάδων πεντακοσίων (4.500) ευρώ και για κάθε επιπλέον ανήλικο μέλος το ποσό των δύο χιλιάδων διακοσίων πενήντα (2.250) ευρώ, μέχρι του συνολικού ορίου των τριάντα μία χιλιάδων πεντακοσίων (31.500) ευρώ» · Checked: 2026-10-12
Official evidence · ΚΥΑ ΥΠΕΝ/ΔΗΕ/70697/861/2020 (ΦΕΚ Β΄ 3088/2020): «έως το ποσό των εκατόν είκοσι χιλιάδων (120.000) ευρώ για το μονοπρόσωπο νοικοκυριό, προσαυξανόμενη κατά δεκαπέντε χιλιάδες (15.000) ευρώ για κάθε πρόσθετο μέλος και έως το ανώτατο όριο των εκατόν ογδόντα χιλιάδων (180.000) ευρώ» · Checked: 2026-09-30
Official evidence · ΚΥΑ ΥΠΕΝ/ΔΗΕ/70697/861/2020 (ΦΕΚ Β΄ 3088/2020): «Τα μέλη του νοικοκυριού τους να μην εμπίπτουν στις διατάξεις του φόρου πολυτελούς διαβίωσης με την εξαίρεση της υποπερ. i της περιπτ. β της παραγράφου 1 του άρθρου 44 του ν. 4111/2013 για πολύτεκνες οικογένειες» · Checked: 2026-09-30
Official evidence · ΚΥΑ ΥΠΕΝ/ΔΗΕ/7422/130/2023 (ΦΕΚ Β΄ 276/2023): «Να έχουν ληξιπρόθεσμες οφειλές και η αποσύνδεση από το δίκτυο να έχει συντελεστεί μέχρι τις 31.12.2022 καθώς και να παραμένουν αποσυνδεδεμένοι μέχρι την ολοκλήρωση της διαδικασίας» · Checked: 2026-09-30
Based on official sources. For the latest criteria, contact the relevant authority.
How to apply
The steps to apply yourself. Free: you don’t need to pay anyone.
Required Documents
Usually the details gov.gr already holds about you are enough.
Step by step
- 1
Sign in to gov.gr with your TAXISnet codes
You sign in ONLY through the official government page. Never enter your codes anywhere else.
- 2
Open the application service
Go to the official pageAuthority: Υπ. Περιβάλλοντος
- 3
Fill in and submit the application
Enter your details, upload anything requested and submit. Keep the protocol number.
- 4
Track your application
Progress and the final decision appear in your account on the authority / gov.gr.
Indicative guide — the application and final decision are made by the competent authority.
Indicative results — not an official assessment.
The eligibility check, browsing and the full guide are free.
Already applied? Tell us how it went.
What it is
Households whose electricity supply at their main residence has been cut off because of overdue debts and which remain disconnected until they apply. A national measure (Joint Ministerial Decision (JMD) of the Ministry of Environment and Energy/Ministry of Finance), with an income scale following the same logic as KEA (Guaranteed Minimum Income): up to €9,000 for a single-person household, +€4,500 per additional adult member, +€2,250 per additional minor member (with special limits of €24,750 for 3 adults and 1 minor or 2 adults and 3 minors, and €27,000 for 4 adults or 2 adults and 4 minors, from which the increments continue), maximum €31,500 (+€8,000 for a member with a disability of 67%+, +€15,000 for a member who depends on medical devices at home). One-off coverage of the debt to the electricity supplier, in bands. You apply to the competent committee/social service of your own municipality — every municipality in Greece runs its own application round after each new JMD/extension (for example, currently active in 25+ municipalities). Application period: national measure; each municipality opens its own application window after each new JMD/extension.
Lifecycle*
ActivePermanent/ongoing benefit
No fixed end date is currently recorded.
*Cycles, deadlines, and availability may change regularly. Always confirm with the official source before applying.
Benefit details
- Provider
- Υπ. Περιβάλλοντος
- Category
- Energy & Utility Bills
- Status
- Active
- Type of benefit
- One-off support
Details last verified: 12/10/2026